Free calculators for everyday metallurgy: plant recovery and metal accounting, sampling, grinding, classification, flotation, leaching and recovery, lithium, and plant operations and forecasting. Each one shows its formula with every symbol explained, and links to an article on the background.
Metal accounting
Two-product recovery
Recovery and mass yield from feed, concentrate and tail assaysThree-product (bimetallic) recovery
Two concentrates and a tail, such as lead and zincGold in circuit (GIC)
Gold in solution and on carbon across CIL or CIP tanksPlant recovery with gold-in-circuit change
True monthly recovery: gold poured plus the change in GICReconciliation F1, F2, F3
Mine-to-mill F1, F2 and F3 for tonnes, grade and metalWet to dry tonnes and moisture
Dry tonnes from wet tonnes, and moisture from sample massesGold production (tonnes, grade, recovery to ounces)
Tonnes, head grade and recovery to grams and troy ouncesOre blend grade
Blend grade of up to four sources, or the mix for a targetGrade–recovery curve fit
Fit four curves to head grade and recovery, then predict
Sampling and quality
Minimum sample mass (Gy's formula)
Minimum sample mass for a target precisionPycnometer specific gravity
Solids specific gravity from the four pycnometer weighingsDuplicate precision (HARD and RSD)
HARD and pooled RSD for up to eight duplicate pairsSample cutter increment mass
Cross-stream cutter increment mass, with design checks
Comminution
Bond ball mill work index
Work index from the Bond test: Gbp, P80, F80 and test sieveBond test next-cycle revolutions
Revolutions for the next cycle to reach 250% circulating loadGrinding energy and mill power
Bond's equation: kWh/t and mill power from Wi, F80 and P80Operating work index
Compare plant energy use with the laboratory work indexComparative work index
Work index by comparison with a reference oreMill critical speed
Critical speed in rpm and the mill's percentage of criticalCirculating load
Cyclone circulating load from % solids or a sieve analysisBall mill sizing (Bond and Rowland)
Bond power with Rowland efficiency factors EF1 to EF7Make-up ball size
Largest make-up ball size for the feed, ore and millBond crushing work index and crusher energy
Impact crushing work index, crusher energy and powerStockpile live capacity (conical pile)
Total and live tonnes in a conical pile, and hours of feedClosed-circuit crushing load
Crusher throughput, circulating load and screen feedP80 from sieve analysis
Interpolate P80, or any % passing, from sieve results
SAG and SABC circuits
SABC circuit specific energy (Morrell SMC method)
SAG, ball mill and pebble crusher energy from Mia, Mib and MicMorrell Mib from Bond ball mill test
Morrell's fine-grinding index from Bond ball mill test dataMill power draw (Hogg and Fuerstenau)
Net SAG or ball mill power from size, filling and speedMill charge filling from a measurement
Charge filling (% volume) from a liner-to-charge measurement
Classification and dewatering
Thickener unit area and size
Talmage–Fitch and Coe–Clevenger area from settling testsHydrocyclone cut size (Arterburn)
Corrected cut size d50c by Arterburn's methodScreen efficiency
Mass split, recovery of fines and overall screen efficiencyThickener rise rate, solids loading and flocculant
Rise rate, solids loading, flocculant and dilution waterStokes' law settling velocity
Stokes velocity, Reynolds number check and hindered settling
Flotation
Gravity and dense media
Slurry and leaching
Pulp density and % solids
Pulp SG to % solids and back, with volume % and dilutionLeach tank and flotation residence time
Slurry flow and residence time in leach tanks or cellsDissolved oxygen saturation
Oxygen solubility from temperature, pressure and salinityFree cyanide titration (silver nitrate)
Silver nitrate titre to free cyanide, and lime alkalinitySlurry pipeline velocity and pump power
Durand limit deposit velocity and pump shaft powerOxygen uptake and demand
Oxygen uptake rate to demand per tonne and per hourLeach tanks in series (CIL residue and recovery)
Residue grade, soluble loss and recovery over N tanksHCN share of free cyanide vs pH
Share of free cyanide present as HCN at a given pHAgitator power and tip speed
Impeller power, tip speed and power per cubic metreCyanide addition (raise to target strength)
NaCN or liquid cyanide to reach a target free cyanide
Gold recovery and hydrometallurgy
Cyanide destruction reagent
SO₂, metabisulphite, lime and peroxide ratesHeap leach column scale-up
Solution-to-ore ratio and leach time for a taller liftSolvent extraction stages (McCabe-Thiele)
McCabe-Thiele stages for a target raffinateElectrowinning (Faraday's law)
Metal plated, current efficiency and energy per kilogramPressure oxidation oxygen and acid (pyrite)
Oxygen, acid and limestone for pyrite in an autoclaveRoasting sulphur dioxide and air (pyrite)
SO₂, air with excess and calcine mass for roasting pyriteDoré bar gold, silver and troy ounces
Gold and silver in a doré bar, with a gold room checkCarbon inventory extrapolation
Carbon in circuit from weighed removals and surveys
Lithium
Plant operations
Reagent dosing (g/t to pump flow)
Reagent dose in g/t to pump flow and daily useAvailability, utilisation and OEE
Availability, utilisation, rate and OEE from plant hoursPlant and tailings water balance
Tailings water, evaporation, seepage, return and make-upPI controller lambda tuning
PI controller gain and integral time from a step testWeekly mill throughput and grade forecast
Week's dry tonnes, head grade and ounces, with budget checkMonthly mill throughput and grade forecast
Month's tonnes, grade and ounces with stockpile run-downReagent and grinding media forecast
Cyanide, lime and media use, stock cover and cost
These calculators use standard published formulas and are provided as a guide. Check results before relying on them for design or reporting.