Weekly mill throughput and grade forecast calculator
Plan the week day by day or as one block. Enter shutdowns, availability, utilisation, run rate and the ore mix to forecast dry tonnes, head grade and recovered gold, then check it against stockpiles and budget.
The example values are filled in so you can see how it works. Results update as you type.
The formula
where
- run hours in the day or week
- ,
- calendar hours (24 a day, 168 a week) and planned shutdown hours
- ,
- availability (share of the remaining hours without breakdowns) and utilisation (share of available hours the plant runs), as fractions
- ,
- run rate in wet tonnes per hour and ore moisture (% wet basis); with a dry run rate the moisture term drops out
- ,
- share of the feed from source i (fraction) and its grade (g/t); is the blended head grade
- dry tonnes available in stockpile i; the plan must not draw more than this over the week
- gold recovery as a fraction: a fixed figure, or from a constant tail grade (g/t)
- grams in one troy ounce
Want the background? Read Ore blending for the mill: blend grade, the lever rule and throughput on mixed ores.
Discuss your plant with a metallurgist
Tiegel is a Perth metallurgy company. We help with testwork, plant optimisation, metal accounting and investigations.
Talk to a metallurgistThese calculators use standard published formulas and are provided as a guide. Check results before relying on them for design or reporting.