Availability, utilisation and OEE calculator
Enter the hours and tonnes for the period. Agree the definitions with your site: here availability excludes maintenance downtime and counts standby as available.
The example values are filled in so you can see how it works. Results update as you type.
The formula
where
- planned plus unplanned hours when the plant could not run because of equipment (h)
- hours the plant actually treated ore; also excludes standby, such as no feed or no power from the grid (h)
- design throughput (t/h)
Want the background? Read Plant availability, utilisation and OEE: accounting for lost hours and tonnes.