Tiegel home Talk to a metallurgist

Reconciliation F1, F2, F3 calculator

Enter tonnes and grade for the same period and mined volume from the resource model, the grade control model and the mill. The calculator returns the F1, F2 and F3 factors for tonnes, grade and contained metal.

Results

The example values are filled in so you can see how it works. Results update as you type.

The formula

F1=grade control modelresource modelF2=mill (reconciled)grade control modelF3=mill (reconciled)resource model=F1×F2

where

F1
how well the resource model predicted what grade control found, for the same mined volume
F2
how well grade control predicted what the mill received
F3
the overall agreement between the resource model and the mill

Want the background? Read Gold reconciliation from resource model to gold bar: F-factors, gold in circuit and scheduling effects.

Discuss your plant with a metallurgist

Tiegel is a Perth metallurgy company. We help with testwork, plant optimisation, metal accounting and investigations.

Talk to a metallurgist

These calculators use standard published formulas and are provided as a guide. Check results before relying on them for design or reporting.