Tiegel home Talk to a metallurgist

Sample cutter increment mass calculator

Enter the stream flow, the particle top size and the cutter opening and speed. Add the number of increments and the lot duration for the primary sample mass and interval.

Results

The example values are filled in so you can see how it works. Results update as you type.

The formula

w≥3dtopv≤0.6 m/smi=Q3.6×wv

where

w
cutter opening (m); also wide enough not to block
dtop
top size of the particles (the size 95% pass) (m)
v
cutter speed across the stream (m/s), kept constant
mi
mass of one increment (kg)
Q
stream flow of dry solids (t/h); for a slurry use slurry mass flow

Want the background? Read Sampling system design: cross-stream cutters, increment mass and sample stations.

Discuss your plant with a metallurgist

Tiegel is a Perth metallurgy company. We help with testwork, plant optimisation, metal accounting and investigations.

Talk to a metallurgist

These calculators use standard published formulas and are provided as a guide. Check results before relying on them for design or reporting.