Monthly mill throughput and grade forecast calculator
Enter up to five weeks, each with its days in the month, shutdowns, run rate and ore mix. See the month's tonnes, grade and ounces, the stockpile run-down and the gap to budget.
The example values are filled in so you can see how it works. Results update as you type.
The formula
where
- dry tonnes milled in week w
- ,
- days of the week that fall in the month, and planned shutdown hours
- , , ,
- availability and utilisation (fractions), run rate (t/h) and moisture (% wet basis; drops out for a dry run rate)
- ,
- stockpile of source i and ore delivered to it in the month (dry t), with deliveries spread evenly by day
- ,
- share of source i in week w and the week’s blended head grade (g/t)
- recovery: a fixed figure, or (head grade − tail grade) ÷ head grade
Want the background? Read Month-end metal accounting: check-in, check-out, unaccounted metal and the AMIRA P754 code.
Discuss your plant with a metallurgist
Tiegel is a Perth metallurgy company. We help with testwork, plant optimisation, metal accounting and investigations.
Talk to a metallurgistThese calculators use standard published formulas and are provided as a guide. Check results before relying on them for design or reporting.