Tiegel home Talk to a metallurgist

Crushing: the Bond impact work index test and crusher energy calculations

Measurement of the Bond impact crushing work index and its use in estimating crusher energy, with reduction ratios and a two-stage crushing worked example.

· 4 minute read · By

Before ore can be ground, run-of-mine rock is reduced to gravel size by crushers. A jaw crusher compresses rock between a fixed and a moving plate, and a cone crusher compresses it in the gap between a gyrating cone and a bowl. The energy required depends on the toughness of the rock.

Bond's crushing test measures toughness directly. Two heavy pendulum hammers strike a rock specimen simultaneously from opposite sides. The hammers are released from a low angle, and the angle is raised in steps until the specimen breaks. The energy at breakage divided by the specimen thickness is the impact strength of the rock.

Crushing energy is a small part of a concentrator's power consumption, but crusher selection and liner wear depend on rock toughness. This article describes the Bond impact crushing test, the work index calculation and the estimation of crushing energy, with a two-stage worked example.

Two-stage crushing circuitPrimary jaw crusher, screen, secondary cone crusher in closed circuit with the screen, product to stockpile.ROM oreF80 500 mmJaw crusherP80 125 mmScreen30 mmCone crushersecondaryStockpileP80 ~ 25 mmoversize
A two-stage crushing circuit. The cone crusher runs in closed circuit with the screen, so only screen undersize reaches the stockpile.

The Bond impact crushing test

  1. Select the specimens, typically 20 rocks of the size the method specifies, commonly lumps with a minimum dimension of about 75 mm, or lengths of whole HQ or PQ drill core.
  2. Measure the thickness of each specimen in the direction of impact, and the specific gravity of the sample.
  3. Place each specimen between the two pendulum hammers, release them from a low angle, and raise the angle step by step until the specimen breaks. Record the energy at breakage from the hammer mass and drop height.
  4. Calculate the impact strength of each specimen (energy ÷ thickness) and its work index, and report the average, minimum, maximum and standard deviation.
Wi,crush=53.49×CBSGW=10×Wi,crush×(1P80−1F80)

where

CB
impact crushing strength: energy at breakage divided by specimen thickness (J/mm)
SG
specific gravity of the specimen
Wi,crush
Bond crushing (impact) work index (kWh/t)
F80, P80
feed and product 80% passing sizes (µm)

Worked example: a 75 mm thick specimen breaks at 45 J, an impact strength of 0.60 J/mm. With SG 2.7, Wi = 53.49 × 0.60 ÷ 2.7 = 11.9 kWh/t. In the original imperial form, Wi = 2.59 × impact strength in ft·lb per inch ÷ SG, in kWh per short ton.

The test is notoriously variable, because cracks, veins and bedding cause individual specimens to differ widely. The full distribution should be reported from an adequate number of specimens, and some designers use a high percentile rather than the average for crusher selection.

Crusher energy with Bond's equation

The Bond equation used for grinding also gives a first estimate of crushing energy, with sizes in micrometres:

StageF80P80Reduction ratioEnergy (kWh/t)Power at 800 t/h (kW)
Primary jaw500 mm125 mm40.17134
Secondary cone125 mm30 mm4.20.35280

For the jaw crusher, W = 10 × 11.9 × (1/√125,000 − 1/√500,000) = 0.168 kWh/t, or about 134 kW of crushing power at 800 t/h.

Bond crushing energy by stageThe primary jaw needs 0.17 kWh/t and the secondary cone 0.35 kWh/t for the worked example.00.10.20.30.4Primary jaw: 0.17 kWh/t0.17 kWh/tPrimary jawSecondary cone: 0.35 kWh/t0.35 kWh/tSecondary coneSpecific energy (kWh/t)
Specific energy for each stage from Bond's equation with a crushing work index of 11.9 kWh/t. Finer reduction costs more energy per tonne. Illustrative figures.

Each stage achieves a reduction ratio of roughly 3 to 6 depending on crusher type and duty, which is why most plants crush in two or three stages. Installed motors are larger than the Bond figure, because crushers draw power when running empty, must handle peaks, and must break the toughest rocks rather than the average. Final selection uses the manufacturer's capacity tables for the closed-side setting, feed size, ore density and work index, together with simulation of the whole circuit.

Operating considerations

The closed-side setting (CSS) controls product size and should be checked regularly, because liner wear opens it. Choke feeding a cone crusher, with the chamber kept full, improves product shape and liner wear. The abrasion index from Bond's abrasion test is used alongside the crushing work index to predict liner wear.

Tramp metal protection and metal detectors protect crushers from damage. Where crushing precedes a SAG mill, it changes the SAG feed size; the effect on the grinding circuit can be assessed with the SABC energy calculator.

Glossary

Crushing work index
Bond's measure of the energy rock takes to break by impact (kWh/t).
Impact strength
Energy at breakage divided by specimen thickness (J/mm).
Jaw crusher
A crusher that breaks rock between a fixed and a moving jaw; usually the primary crusher.
Cone crusher
A crusher that breaks rock between a gyrating cone and a fixed bowl; usually secondary or tertiary.
Closed-side setting
The smallest gap between the crushing surfaces, which controls product size.
Reduction ratio
Feed size divided by product size for a crushing stage.
Choke feeding
Keeping a cone crusher's chamber full of rock for consistent crushing.

Frequently asked questions

How is the Bond crushing work index calculated?

Wi = 53.49 × impact strength in J/mm ÷ specific gravity, giving kWh per metric tonne. Impact strength is the hammer energy at breakage divided by specimen thickness.

Why is the crushing work index test so variable?

Each rock breaks along its own weaknesses, such as cracks and veins, so individual results scatter widely. Many specimens are tested and the spread is reported.

Can Bond's equation be used to size a crusher?

It gives a first estimate of crushing energy and a basis for comparing ores. Crushers are selected from manufacturer capacity data and circuit simulation.

What reduction ratio does a crusher achieve?

Roughly 3 to 6 per stage, depending on crusher type and duty, which is why plants use two or three stages.

Discuss your plant with a metallurgist

Tiegel is a Perth metallurgy company. We help with testwork, plant optimisation, metal accounting and investigations, and we build the Tiegel Suite software.

Talk to a metallurgist

References and further reading

  1. Bond, F.C. (1961). Crushing and grinding calculations. British Chemical Engineering, 6.
  2. SAGMILLING.COM. Testwork: Bond crushing work index. Link
  3. Wills, B.A. and Finch, J.A. (2016). Wills' Mineral Processing Technology, 8th edition. Butterworth-Heinemann. Chapter 6, Crushers.

Worked examples and charts marked illustrative use invented figures, not data from any operation.